What's better than an error-free concrete pour?

Knowing it will be.  

With today's tight tolerances, coordinated trades, precision design and accelerated schedules - can you afford milestone setbacks, rework, and undocumented changes to plans? ReadySet by Prologue identifies misplaced plumbing risers, conduit, embeds, sleeves and formwork prior to the concrete pour.  By catching errors early, you can proceed with confidence.  

Confirm with ReadySet. Pour with confidence.   

 

 
ReadySet Cover 2018.jpg

Over 1 Million Successful Square Feet

Multifamily builders throughout the Mid-Atlantic region used ReadySet

to verify rough-ins on over 1 Million square feet in 2017.


 
 

Pour With Confidence.


Think of ReadySet℠ as insurance for your concrete pour. With it, you can be sure all the elements on the site are placed properly prior to pouring the slab, reducing costly change orders and concrete re-work.

 
markets-background.jpg
 

It's Simple Math.

Remediation of misplaced elements requires costly GPR, core drilling, saw cutting, and wall adjustments. That adds time and cost to already tight time lines and budgets and creates problems further down the construction sequence. With ReadySet℠ by Prologue, you can eliminate concrete re-work from your next construction project.
 

BENEFITS INCLUDE:

 

Easy-to-Read CAD Overlays and Annotations

  • Optimized for electronic review

  • Formatted for field printing

  • High-contrast annotations
  • No special software or viewers

On-Site 3D Laser Scanning

  • Approximately 1 hour for 10,000 square feet field time
  • Minimal disruption to trades
  • Flexibility to schedule around changing conditions

Confirm Slab Prep Conditions Before You Pour

  • Plumbing and conduit stub ups
  • Formwork installation 
  • Rebar and post-tension cables
  • Thickened slab locations

Next Day Delivery

  • Same-day delivery on established small jobs
  • Simple email of PDF
  • Prices as low as 10 cents per square foot

EXTENDED SERVICES ARE AVAILABLE: 

 

Volume Analysis

Formwork Elevation for Levelness

  • Concurrent or post levelness and flatness

Documentation of Concrete Inserts

  • Embeds
  • Sleeves and Plates
  • Rebar and Post-tension Cables
 
The results of this scan proved to be extremely valuable after having identified several locations where plumbing was out of a wall or interfering with other construction. Each of the issues identified were fixed before any concrete was poured, thereby eliminating costly, destructive remediation down the road.
— KBS Construction
 
Readyset-quote-bg-2.jpg

ReadySet Clients Include:

 
Artboard 2.png
 

See how we identify and fix potential field problems early. 

 
 
from-the-field-background.jpg
 

What to Expect with ReadySet℠: Before, During and After the Pour

To make the process quick and painless, we have compiled the following guide.

Become a ReadySet℠ On-Demand Partner

ReadySet℠ is the go-to, pre-slab verification for construction companies who need to pour with 100% confidence. With a 24-hour turnaround, Prologue will perform ReadySet℠ on your site, keeping your projects on time and on budget.
 
leadership-background.jpg